STUD TRACK FURRING CEILING SECTION PERIMETER CHANNEL INTERMEDIATE SECTION FOR SUSPENDED GRIO FALSE CEILING SYSTEM AND GYPBOARD PARTITION SYSTEMS.
Metcraft Engineering Corporation is the largest and the foremost manufacturer of light gauge Galvanized metal sections for suspended grid false ceiling system and gypboard partition systems in India.
These light Gauge sections are manufactured in our state of the art Roll forming lines installed at our Palghar Plant which is just 104 kms from Mumbai city.
We use latest technology and manufacturing systems for manufacturing these sections under strict quality control conditions. The assurance of our quality con be gauged from the factor that during F.Y. 1996-97 and F.Y. 1997-98 our rejection proportion was just 0.00 1 % of total sales.
We exercise high level of quality control from procurement of galvanized steel, slitting of steel, manufacturing sections, and then packing and shipment of these sections. We believe in total integrated manufacturing systems. Right from manufacturing of slitting lines, Roll forming lines,on line section punching feeders, contoured rollers and dies are all made in house by extremely dedicated Engineering team.
Stud Track Furring
Quite
Easily Done False Ceiling System
QED False ceiling system from Metform Corporation is
ready to use, pre-finished, grid system. It is developed
to meet the demand for simple, easily assembled, economical
suspended ceiling. It consists of three simple members
which assemble into structurally secure rapid grid,
withoutthe use of lever,pin.
Sturdy and easy to use, QED systems has fast and easy
installation. All tees are identical. Just insert any
tee end into slots provided into main runners and snap
down for perfect alignment and positive locking with
exposed system and steel frames will be visible underneath.
METHOD
» |
Measure
the length & breadth of the room |
» |
Decide
the size of the title to be put |
» |
Mark
the levels on all sides of the wall |
» |
Mark
the position of the runners on the width |
» |
Fix
up wall channels and level them correctly |
» |
Mark
the existing ceiling for the position of hanger
at every 4ft. distance |
» |
Suspend
the runners by means of G.I. wire and level them |
» |
Lock
up the runners of joints and place the tile on
them |
|